Back to the map

A7 Dorno Ovest

Standard AC · 43 kW
See on the map
Directions
Charge points1 charge points
Type 2
1 × 22 kW
CHAdeMO
1 × 43 kW
CCS
1 × 42 kW
CCS
1 × 22 kW
Type 2
1 × unknown
Type 2
1 × unknown
Practical
AddressAutostrada dei Giovi / Serravalle, Dorno
Max power43 kW
Frequently asked questions
How fast can I charge at A7 Dorno Ovest?
A7 Dorno Ovest has a maximum power of 43 kW (Standard AC).
Which plugs does A7 Dorno Ovest have?
A7 Dorno Ovest has 3 × TYPE2_SOCKET, 1 × CHADEMO and 2 × CCS.
Source: ocm · updated 19/02/2021