Back to the map

Be Charge Parco dei Cedri

Be Charge (Italy) · Standard AC · 22 kW
See on the map
Directions
Charge points1 charge points
Type 2
2 × 22 kW
Practical
AddressVia Cracovia 2, Bologna
Max power22 kW
Frequently asked questions
How fast can I charge at Be Charge Parco dei Cedri?
Be Charge Parco dei Cedri has a maximum power of 22 kW (Standard AC).
Which plugs does Be Charge Parco dei Cedri have?
Be Charge Parco dei Cedri has 2 × TYPE2_SOCKET.
Source: ocm · updated 12/03/2022