Back to the map

BCD Engineering

ePower · Standard AC · 47 kW
See on the map
Directions
Charge points2 charge points
CCS
2 × 47 kW
Practical
AddressRailway Rd, Charleville
OperatørePower
Max power47 kW
Frequently asked questions
How fast can I charge at BCD Engineering?
BCD Engineering has a maximum power of 47 kW (Standard AC).
Which plugs does BCD Engineering have?
BCD Engineering has 2 × CCS.
Source: ocm · updated 12/06/2026