Back to the map

The Campus Building

EZO (IE) · Standard AC · 22.1 kW
See on the map
Directions
Charge points3 charge points
Type 2
3 × 22.1 kW
Practical
AddressCherrywood Business Park, Cherrywood
OperatørEZO (IE)
Max power22.1 kW
Frequently asked questions
How fast can I charge at The Campus Building?
The Campus Building has a maximum power of 22.1 kW (Standard AC).
Which plugs does The Campus Building have?
The Campus Building has 3 × TYPE2_SOCKET.
Source: ocm · updated 24/12/2025