Northminster LTD
POD Point (UK) · Standard AC · 7 kW
Practical
Frequently asked questions
How fast can I charge at Northminster LTD?
Northminster LTD has a maximum power of 7 kW (Standard AC).
Which plugs does Northminster LTD have?
Northminster LTD has 1 × TYPE2_SOCKET.
ⓘSource: ocm · updated 31/01/2025