Back to the map

E.ON Drive Infrastructure GmbH

E.ON Drive Infrastructure GmbH · Fast charger · 300 kW
See on the map
Directions
Charge points2 charge points
CCS
2 × 300 kW
Practical
AddressEllund-Ost, 24983 Handewitt
Max power300 kW
Frequently asked questions
How fast can I charge at E.ON Drive Infrastructure GmbH?
E.ON Drive Infrastructure GmbH has a maximum power of 300 kW (Fast charger).
Which plugs does E.ON Drive Infrastructure GmbH have?
E.ON Drive Infrastructure GmbH has 2 × CCS.
ⓘSource: osm