Back to the map

Instalaciones Boned-Braco

Fenie Energía (Spain) · Standard AC · 7.4 kW
See on the map
Directions
Charge points2 charge points
Type 2
1 × 7.4 kW
Schuko
1 × 2.3 kW
Practical
AddressRonda de la Industria S/Nº la Magantina 22006, 22006 Huesca
Max power7.4 kW
Frequently asked questions
How fast can I charge at Instalaciones Boned-Braco?
Instalaciones Boned-Braco has a maximum power of 7.4 kW (Standard AC).
Which plugs does Instalaciones Boned-Braco have?
Instalaciones Boned-Braco has 1 × TYPE2_SOCKET and 1 × SCHUKO.
Source: ocm · updated 12/07/2025