Back to the map

Urbeo - Clonsilla

GoCharge (IE) · Standard AC · 7.4 kW
See on the map
Directions
Charge points30 charge points
Type 2
30 × 7.4 kW
Practical
AddressWindmill Ct, Blanchardstown
OperatørGoCharge (IE)
Max power7.4 kW
Frequently asked questions
How fast can I charge at Urbeo - Clonsilla?
Urbeo - Clonsilla has a maximum power of 7.4 kW (Standard AC).
Which plugs does Urbeo - Clonsilla have?
Urbeo - Clonsilla has 30 × TYPE2_SOCKET.
Source: ocm · updated 15/06/2025
Urbeo - Clonsilla - charging station in Blanchardstown · FindCharger