Back to the map

Cooperativa De Meirás San Mateo

TotalEnergies (ES) · Fast charger · 150 kW
See on the map
Directions
Charge points2 charge points
CCS
2 × 150 kW
CHAdeMO
1 × 50 kW
Type 2
1 × 22 kW
Practical
AddressCampo Ratas Trasancos, 15405 Narón
Max power150 kW
Frequently asked questions
How fast can I charge at Cooperativa De Meirás San Mateo?
Cooperativa De Meirás San Mateo has a maximum power of 150 kW (Fast charger).
Which plugs does Cooperativa De Meirás San Mateo have?
Cooperativa De Meirás San Mateo has 2 × CCS, 1 × CHADEMO and 1 × TYPE2_SOCKET.
Source: ocm · updated 13/09/2024